Sample Approval & Production Handoff

Define who approves which sample, purpose and revision. Keep corrections and open conditions visible before any separate production release.

Sample planning and local drafts ยท No confirmed sample order, approval, shipment or production release is created by these pages.

Prepare the approval references

Suggested decision inputs, not a website-issued approval.

Product & specification
Use the style/project ID, technical-file revision and agreed measuring method. Identify which files supersede earlier versions.
Physical sample
Record sample ID/revision, purpose, receipt/review date, reviewed size/colour and material/trim references. A design name alone is not a physical-sample identifier.
Review scope
Name the fit, construction, material or artwork areas actually reviewed. Mark temporary components and unresolved evidence separately.
Decision & follow-up
Record the reviewer, proposed outcome, conditions, corrections and next review. The authorised written decision is separate from a locally prepared draft.

Confirm the decision in a clear sequence

Agree the authorised approver and what requires another physical sample.

  1. Verify identity & scope

    Match the actual sample to the specification, size/colour, material/trim and artwork references being reviewed.

  2. Review and document

    Record fit/measurements, construction, material and decoration observations separately. Identify temporary components and pending evidence.

  3. Agree corrections & impact

    Locate each requested change, identify responsibilities and assess re-sampling, costs and timing before affected work.

  4. Review the revised version

    Compare the new sample and files against the previous issue log. Record resolved items and carry open conditions forward.

  5. Issue the authorised decision

    Through the agreed channel, record approver, date, sample/specification revisions, purpose, limits and conditions. The local draft is not that decision.

Keep approval limits explicit

Do not extend a narrow review beyond what was actually checked.

Prototype versus final materials
A temporary material or trim must remain identified. Prototype shape review does not approve an unreviewed final material.
One size versus grading
Name the reviewed size(s). A single fit sample does not automatically approve every size or grading rule.
Artwork proof versus finished decoration
A file proof and a decorated sample have different review scopes. Record method, placement and actual material where relevant.
Visual review versus performance
Fit or construction feedback is not a test report or proof of a functional/compliance claim. Define the needed product-specific evidence separately.
Sample versus bulk
The sample reference does not establish the conformity of a later batch. Inspection and deviation handling require their own plan.

Release production as a separate decision

Sample approval alone does not confirm price, quantity, booking or dispatch.

Approved baseline
Final specification, BOM/materials, chart, artwork/packing files and physical-sample IDs/revisions.
Open-item disposition
Record outstanding evidence, substitutions or corrections and how they must be resolved before affected production or release.
Quantity & commercial scope
Confirm style/colour/size allocation, minimum basis, current quote and agreed commercial/booking conditions.
Inspection & responsibility
Name criteria, review method, deviation decision owner and dispatch authorisation requirements.

Questions about approval

Use the actual project records and operating channel for authorised decisions.

Can silence or an acknowledgement count as approval?

This guide assumes no such automatic approval. Agree the decision method and named authority, and record the actual scope and conditions.

Can a conditional decision be treated as fully released?

Do not hide the conditions. Record the affected scope, required follow-up and who can authorise the next step under the agreed plan.

Does sample approval confirm price and delivery?

No. Commercial scope, material availability, timing, booking and production commitment require separate confirmation.

Can a later material substitution use the same approval automatically?

No automatic extension is stated. Review the impact and document the required change decision and re-sampling before affected work.

Keep feedback traceable.

Use the agreed operating channel for scope, charges and authorised decisions. Downloading a draft does not transmit it or confirm acceptance.

Prepare a review draft