Move through documented approval gates
A proposed review sequence, not an automatically active project. Agree the actual owners, deliverables and release conditions.
Technical review
Buyer supplies the named revision and open questions. Review the drawings, material references and measurement methods; record missing inputs and feasibility decisions.
Approval record: A dated gap list and agreed specification baseline before a firm production scope.
Quote & scope
Review material assumptions, sampling, tooling or pattern work, quantity basis, currency, cost scope and timing dependencies.
Approval record: Written agreement on inclusions, exclusions and which assumptions still need confirmation.
Sample & corrections
Compare the versioned sample with the agreed chart and construction. Record each requested correction and whether it changes material, cost or timing.
Approval record: Named approval owner and a correction log; confirm which revisions or additional samples require a separate charge.
Pre-production release
Identify the sample revision, final files, material/trim approvals, colour/size allocation, packing and inspection plan.
Approval record: Written release of the specific approved version, subject to the agreed commercial and booking conditions.
Bulk review & dispatch
Plan the agreed inspections, document deviations and resolve release issues. Confirm packing, shipping documents and delivery arrangements.
Approval record: Recorded bulk disposition and dispatch authorisation; sample approval alone is not proof of bulk conformity.
Keep a date, revision, decision, approver and unresolved items for each gate. Do not treat a website brief, email acknowledgement or sample photo as a production release.