Six connected approval gates
This is a proposed planning sequence, not a live project tracker. Agree actual deliverables, owners and conditions.
Brief & route
Identify intended product and use, design readiness, authorised references, market, quantity unit and open decisions. Select OEM, ODM or Private Label by the actual work needed.
Responsibilities to agree: Buyer provides the inputs; the proposed development/supply scope and named contacts need review.
Decision record: A dated brief, route decision and gap list. No quote or project acceptance is created by preparing a brief.
Scope & quote
Separate development and production deliverables, quantity/minimum basis, assumptions, costs, currency, evidence requirements and timing dependencies.
Responsibilities to agree: Agree the review owner and which party supplies, checks or approves each input before commissioning work.
Decision record: Written scope and commercial confirmation, identifying exclusions, price validity and unresolved conditions.
Materials & technical baseline
Review the actual material/trim direction alongside drawings, measurements, construction and artwork. Treat a guide or visual reference as an input, not an approved material record.
Responsibilities to agree: The agreed sourcing/development contact records candidates; the named approver decides the proposed baseline and any evidence needs.
Decision record: Versioned BOM/material references, drawings and chart, with substitutions and open tests explicitly identified.
Sample & corrections
Plan the required development, fit, decoration or pre-production samples. Link comments to sample ID, revision and feature; classify corrections separately from new requirements.
Responsibilities to agree: Agree the sample reviewer, fit reference and final approval owner. Specify which changes require another sample or extra scope.
Decision record: Dated sample decision and correction log, identifying exactly which size, material, artwork and construction were reviewed.
Production release & quality
Identify final technical files, approved samples/materials, size/colour allocation, packing and inspection criteria. Resolve or explicitly handle outstanding items before release.
Responsibilities to agree: The named owner authorises production only under the agreed commercial/booking conditions; inspection and deviation decisions need assigned owners.
Decision record: Written production baseline and release; inspection/disposition records for the actual bulk. Sample approval alone does not verify bulk quality.
Dispatch & reorder
Confirm release disposition, quantities, packing, shipping documents and delivery arrangements. Reorders refer to the approved baseline but need current sourcing and commercial confirmation.
Responsibilities to agree: Agree dispatch authorisation and follow-up contacts. Review any licensed-design or agent attribution requirements only where they actually apply.
Decision record: Dispatch/reorder reference and outstanding-issue log. Past orders do not establish unchanged availability, pricing or timing.