Identify the version before reviewing
Keep the observed sample and intended specification visible at the same time.
- Product & specification
- Use the style/project ID, technical-file revision and agreed measuring method. Identify which files supersede earlier versions.
- Physical sample
- Record sample ID/revision, purpose, receipt/review date, reviewed size/colour and material/trim references. A design name alone is not a physical-sample identifier.
- Review scope
- Name the fit, construction, material or artwork areas actually reviewed. Mark temporary components and unresolved evidence separately.
- Decision & follow-up
- Record the reviewer, proposed outcome, conditions, corrections and next review. The authorised written decision is separate from a locally prepared draft.