Resolve availability and scope through manual confirmation.
Can I specify a colour that is not available?
You can describe a requested direction, but mark it as unconfirmed. Confirm sourcing, substitutes, cost and timing before work.
Where should I put specification revisions or test requirements?
Use the requirements and revisions field. Name the actual file/material reference and required review; the form uploads or fetches no evidence.
Does requesting a pre-production sample authorise bulk?
No. Agree the sample scope and its approval, then separately confirm the production baseline and commercial release conditions.
Does the form send my details automatically?
No. It generates a local downloadable brief. You must review and share it yourself through the agreed operating channel.
Keep materials and sample versions together
Prepare one material or component record linked to its style/specification and physical reference. Separate requested details, known identifiers and unresolved questions; no approval is issued.
The worksheet stays local until downloaded. Copy the reviewed notes manually into your sample request, feedback or Project Brief; nothing is automatically attached, transferred or submitted.
Move from request to review.
Use the agreed operating channel for scope, charges and authorised decisions. Downloading a draft does not transmit it or confirm acceptance.