Design. Develop. Source. Manufacture.

Woven & Shell Fabric Selection

Compare construction, surface and garment compatibility against a named material brief before selecting a shell fabric.

Material sourcing guidance · No verified inventory, price, test result or material approval is issued by these pages.

Information to prepare

Application
State the garment, season, intended use and whether lining or reinforcement is planned.
Fabric structure
Request fibre composition, weave, weight with units and usable width. Leave unknown values open for sourcing review.
Surface and finish
Describe touch, drape, colour, coating or lamination requirements; a photograph cannot confirm these properties.
Supply constraints
Clarify colour options, material MOQ, sampling quantity, repeat availability and quotation validity.
Claims
List any desired performance as a requirement, not a verified property of an untested material.

Review the right sequence

  1. Prepare the fabric brief

    Link the proposed material to a garment reference, target feel and open questions.

  2. Compare physical swatches

    Record source, reference and date; compare face and reverse, drape, colour and handle.

  3. Review garment compatibility

    Check sewing, seam treatment, lining and trim interaction on a development sample.

  4. Confirm the selected revision

    Record composition, finish, colour approval and any outstanding test requirements before production.

Keep these checks distinct

Swatch is not garment proof
A promising swatch does not establish waterproof seams or finished-garment performance.
Colour review
Specify the physical colour reference and how bulk shade variation should be assessed.
Material substitutions
A replacement source, construction or finish needs review against the approved specification.
Record continuity
Link the swatch and approved material version to the sample and order.

Questions before you start

Do you have a published stock fabric list?

Not yet. This page is sourcing guidance; no verified fabric stock, price or availability is implied.

Can I start with a reference jacket?

Yes, describe the reference and what you want to retain or change. Its material composition and performance still need confirmation.

Does a shell swatch approve the garment?

No. Link the chosen material to a sewn sample and review construction, trims and the stated evidence separately.

Can a finish be changed after approval?

Treat a proposed finish or source change as a new revision. Review affected samples, evidence and costs before acceptance.

Related next steps

Compare the candidate against its intended use

Review questions, not a stock list or promised performance specification.

Face, reverse & finish
Record the two surfaces, coating/lamination direction and requested handle or drape. Keep finish and construction identifiable, not just a marketing fabric name.
Construction compatibility
Ask how the candidate will be sewn, reinforced and combined with linings, zips and seam treatment. Review the actual construction on a representative sample.
Colour & physical reference
Identify colour-reference version and physical approval method. Compare proposed variants and record how bulk shade will be reviewed.
Requested evidence
Name the relevant claim, specimen, test method and review criterion for discussion. Do not treat a water-repellent finish, visual sample or fabric report as proof of waterproof garment seams.
Supply comparison
Compare usable width, units, colour/finish minimum basis, sampling allowance, quote date and repeat availability only when confirmed by the actual source.

Keep every candidate identifiable

Suggested record fields to maintain through the agreed operating channel. No material database or approval account is created here.

Identity & revision
Candidate ID, source reference, material/component version, physical swatch ID and review date. A family name is a sourcing direction, not a unique material SKU.
Specification & units
Record composition, construction, weight with units, usable width or component dimensions, colour and finish when confirmed. Mark unknown details explicitly.
Supply & quotation
Record minimum basis (material/colour/finish/component), counting units, sample availability, price basis, quote date/validity and timing dependencies from the actual source.
Evidence & review scope
Name the specimen and document, method, result and limitations where supplied. Track missing or unverified evidence separately; a visual review is not a test report.
Sample & order linkage
Link the reviewed candidate to garment/sample/specification and BOM revisions. Keep proposed, reviewed and approved status separate, with approver, date and scope.

Move from swatch to garment decision

The link carries this guide reference for context. Replace it with an actual material ID when known; it does not identify verified inventory.

Prepare the request
Name the garment/application and candidate references; describe handle, colour and open questions in the requirements field. For trims, specify whether a component or artwork proof is needed and confirm feasibility separately.
Confirm the actual scope
Agree available candidate, sample count/size, fees, destination, dispatch and timing before commissioning. A local brief is not a paid order or shipment booking.
Review physical candidates
Record source, candidate/swatches and dates. Compare requested properties under agreed conditions and identify what still needs a garment sample or separate evidence.
Confirm a linked sample
Use the selected material/component revisions on an identified garment sample and record the scope of the authorised decision.
Control changes and repeats
If source, composition, finish, colour or component changes, retain old/new revisions and assess further sample/evidence review. Earlier approval does not silently cover substitutes.

Keep materials and sample versions together

Prepare one material or component record linked to its style/specification and physical reference. Separate requested details, known identifiers and unresolved questions; no approval is issued.

The worksheet stays local until downloaded. Copy the reviewed notes manually into your sample request, feedback or Project Brief; nothing is automatically attached, transferred or submitted.

Prepare your next step.

Bring the references you have and the questions still open.

Prepare this project brief