Design. Develop. Source. Manufacture.

Plan quantities before asking for an MOQ

A practical guide to order, style, colour and size breakdowns. Product-specific minimums and feasibility still require review.

Define the unit before the number

A quantity is not a complete MOQ statement. Ask which unit the minimum applies to and whether proposed colours and sizes can be combined. Minimums remain subject to product-specific review; this guide does not promise a universal minimum.

Per order
The combined order total. This does not establish a minimum for each style or colour.
Per style
Units of one identified design. Confirm whether colour variants can count together.
Per colour
Units of one colour within a style. Confirm any material or dye-lot constraints separately.
Per size
The requested size breakdown. Mixed sizes are a question to confirm, not an automatic entitlement.
Piece or set
Identify the counting unit. For a two-piece outfit, distinguish complete sets from individual garments.

Show a quantity breakdown

Illustration only — not an offer: a buyer requests 300 pieces of one style, split into two colours with 150 pieces each. Each colour has sizes S: 30, M: 60 and L: 60.

The figures reconcile: 30 + 60 + 60 = 150 per colour; 150 + 150 = 300 per style. The supplier still needs to confirm whether this breakdown is feasible. A 300-piece order does not imply that a 150-piece colour minimum is accepted.

For several styles, give each style its own colour and size breakdown. Do not apply a single order total to every style.

Questions to include in a quantity request

  • What is the minimum per order, per style and per colour for this specific scope?
  • Can these colours and sizes be combined? Which combinations remain separate?
  • Are fabric, trim, artwork or packaging minimums different from the garment minimum?
  • Which sample stage is needed before a production quantity can be accepted?
  • If a quantity is not feasible, which scope changes should be reviewed first?
  • How are pieces, pairs or sets counted, and does the proposed total reconcile?

Sample quantities and production quantities are separate requests. This guide does not calculate costs, promise discounts or confirm stock.

Choose the matching preparation tool